- How long does it take to paint a whole property?
- An 80-100 m² property with a two-person team is painted in 3-4 days with two coats. If walls need repairing, stucco removing, or damp treatment beforehand, add 2-3 days.
- Do you paint exterior facades at height?
- Yes, up to the second floor with our own elevated work platforms. For taller buildings, we work with specialised companies with authorisations for vertical work.
- Do you treat rising damp?
- Yes, using chemical barrier injection methods and waterproofing mortars. We guarantee the treatment for 5 years. Painting over damp without treating it never works, it always returns.
- Do you do small integral renovations?
- Yes, we complete bathrooms and kitchens up to 15 m²: demolition, plumbing, electrical, tiling, sanitary ware, and painting. For larger renovations, we refer to a specialised construction partner.
- Do you cover and protect the house before painting?
- Of course. We cover floors with foam core board or thick plastic, protect sockets and skirting boards with tape, and move light furniture. We move heavy items away from the centre of the room.
- Is the quote free?
- Yes, free and without obligation. A preliminary visit to measure and check the condition of the walls. A detailed itemised quote within 24-48 hours.