Our Appliance Connection Process
Our service begins with a thorough assessment of your existing plumbing infrastructure and the requirements of your new appliance. Typically, the process unfolds in four clear steps:
- 1
Initial Site Survey (15-30 minutes)
A plumber will visit your home in Sant Andreu to evaluate the location, check water supply and drainage points, and confirm electrical access. We'll discuss any necessary modifications and provide a transparent quote.
- 2
Preparation and Isolation (10-20 minutes)
Before any work begins, we ensure the main water supply to the area is safely isolated. We prepare the necessary tools and materials, protecting your home from any potential spills.
- 3
Connection and Testing (45-90 minutes)
We meticulously connect the water inlet and outlet hoses, ensuring all seals are tight and secure. For dishwashers, this includes connecting to the hot water supply if available. We then run a test cycle to check for leaks, proper drainage, and correct operation.
- 4
Final Checks and Cleanup (10-15 minutes)
After confirming everything is functioning perfectly, we tidy the work area, remove any debris, and provide you with advice on maintaining your new connections. We'll also answer any questions you may have about your appliance's plumbing.
