Our Appliance Connection Process
Our plumbing service for washing machine and dishwasher connection follows a clear, efficient four-step process, designed to minimise disruption and ensure a perfect setup.
- 1
Initial Assessment and Site Preparation (15-30 minutes)
Upon arrival, our technician will assess the installation area, identify existing water supply and drainage points, and confirm the necessary connections. We'll prepare the space, ensuring it's clean and accessible for the installation.
- 2
Water Supply and Drainage Hook-up (30-60 minutes)
This step involves carefully connecting the appliance's water inlet hoses to the appropriate hot and cold water taps (if applicable) and securing the drainage hose to the waste pipe. We use high-quality seals and fittings to prevent future leaks.
- 3
Electrical and Leveling (10-20 minutes)
While we are primarily plumbers, we ensure the appliance is correctly positioned and levelled for stable operation. For electrical connections, we advise ensuring a suitable socket is available, though we do not perform electrical wiring ourselves.
- 4
Testing and Final Checks (10-15 minutes)
Once connected, we run a test cycle on the appliance to check for any leaks, proper water intake, and efficient drainage. We also verify that all connections are secure and answer any questions you may have about your new setup. The entire process typically takes between 65 to 125 minutes, depending on complexity.
