How we work
The construction process is quite clean. First, we assemble the metal structure of galvanized steel profiles, screwed to the floor and ceiling. Electrical cables and water pipes, if any, are run through, and the interior is filled with rock wool or glass wool mats for considerable sound insulation. Plasterboard panels are screwed to both sides. They are jointed with fibre tape and jointing compound, sanded between coats until a completely smooth surface is achieved, ready for painting. Call us, message us on WhatsApp, or request your quote online — we will respond in under 10 minutes during business hours. The first step is a substrate diagnosis. If the existing paint is well adhered, we cover it. If it's flaking, we remove it completely with a spatula and sander, leaving the substrate clean. If there are structural cracks (not superficial), we treat them with elastic filler that accommodates small building movements without re-cracking. If there are saltpeter stains or white efflorescence, we remove them with a specific chemical product and neutralise before painting.
