Our Exterior Painting Process: A Step-by-Step Guide
Our exterior painting service in El Poblenou follows a structured approach to ensure a superior, long-lasting finish. First, we conduct a thorough site inspection and surface preparation (1-2 days), which includes cleaning, scraping loose paint, repairing minor cracks, and sanding. This crucial step ensures optimal paint adhesion. Second, we apply a high-quality primer (0.5-1 day), tailored to the surface material, to seal and create a uniform base. Third, we apply two coats of premium exterior paint (2-4 days), allowing adequate drying time between coats for maximum durability and colour depth. Finally, we perform a detailed clean-up and final inspection (0.5 day), ensuring your property is immaculate and you are completely satisfied with the result. The entire process for a typical facade can range from 4 to 7 days, depending on the size and condition of the surface.
