How we work
Rising damp, roof leaks, internal condensation, and salt efflorescence. Diagnosis before action. Chemical injection, external waterproofing, breathable coating or ventilation as per diagnosis. We start with ceilings, lights, air ducts, and high parts of cupboards, where the finest dust accumulates. We then proceed to walls, doors, frames, skirting boards, radiators, and blind guides. After that, internal and external carpentry, windows inside and out, taps and sanitary fixtures. We finish with the floors, which are done last because they collect everything that falls during the process. Thorough vacuuming, mopping with a neutral product, and, if necessary, a second mop to remove the last veil of construction dust.