Our step-by-step wall smoothing process
- 1
Assessment & Preparation (30-60 min)
An expert technician visits your Badalona property to inspect the wall condition, identify the current finish type (e.g., 'gotelé', plastic paint), and measure the surfaces. Furniture and floors are protected with plastic sheeting and masking tape to prevent any splashes or damage.
- 2
Product Application (2-4 hours per room)
A layer of levelling compound or special plaster is applied to cover the texture of 'gotelé' or imperfections. Depending on the wall's condition, one or more coats may be necessary, allowing recommended drying time between each application.
- 3
Sanding & Finishing (1-3 hours per room)
Once the compound is dry, fine sanding is performed across the entire surface. We use sanding machines with extraction systems to minimise dust and achieve a perfectly smooth, uniform finish. Protective materials are then removed.
- 4
Priming & Painting (4-8 hours per room)
A coat of primer is applied to seal the surface and ensure better paint adhesion. Finally, one or two coats of the customer's chosen paint are applied, guaranteeing a crisp and durable finish.
