Our Sanitary Fixture Installation Process in La Marina de Port
Our installation process is designed for efficiency and precision, ensuring a smooth experience from start to finish. We prioritise clear communication and meticulous execution.
- 1
Initial Consultation and Site Assessment (15-30 minutes)
We begin by discussing your specific needs, reviewing the chosen fixtures, and assessing the current plumbing setup in your La Marina de Port property. This allows us to identify any potential challenges and plan the installation thoroughly.
- 2
Preparation and Old Fixture Removal (30-90 minutes)
Before installing new units, we carefully turn off the water supply, drain any remaining water, and expertly remove the old sanitary fixtures. We take care to protect surrounding surfaces and dispose of old units responsibly.
- 3
New Fixture Installation and Connection (1-4 hours per fixture)
This is where our expertise shines. We precisely position the new toilet, sink, bidet, or shower tray, ensuring it's level and securely fastened. All water supply lines and drainage pipes are connected, sealed, and tested for leaks.
- 4
Testing, Cleanup, and Handover (15-30 minutes)
Once installed, we thoroughly test all new fixtures to confirm proper functionality, water pressure, and leak-free operation. We then clean up the work area completely, leaving your space tidy, and provide any necessary usage instructions.
