Our Sanitary Installation Process: From Assessment to Perfect Function
Our installation process is designed for efficiency and minimal disruption, typically completed within a few hours to a full day depending on complexity. It begins with a thorough assessment and ends with a fully functional, leak-free installation.
- 1
Initial Consultation & Site Assessment (15-30 minutes)
We start by discussing your specific needs, inspecting the existing plumbing, and taking precise measurements. This ensures compatibility with new fixtures and identifies any potential challenges in your Centre property.
- 2
Preparation & Old Fixture Removal (30-90 minutes)
We carefully prepare the area, protecting surrounding surfaces. Old toilets, sinks, or showers are then professionally disconnected and removed, with waste disposed of responsibly according to local regulations.
- 3
New Fixture Installation & Connection (1-4 hours)
The new sanitaryware is meticulously positioned, levelled, and securely fastened. We then connect all water supply lines and drainage, using high-quality seals and fittings to prevent leaks.
- 4
Testing, Sealing & Final Inspection (30-60 minutes)
Once installed, we thoroughly test all new connections for leaks, check water pressure, and ensure proper drainage and flushing. Any necessary silicon sealing is applied, followed by a final clean-up and client walkthrough to confirm satisfaction.
