Our Sanitary Installation Process in Arenys de Mar
Our installation process is designed for efficiency, minimal disruption, and lasting quality. We follow a structured approach to ensure every detail is covered.
- 1
Initial Consultation and Site Assessment (15-30 minutes)
We begin by discussing your specific needs, reviewing the chosen sanitary ware, and assessing the existing plumbing infrastructure. This helps us identify any potential challenges and plan the installation meticulously.
- 2
Preparation and Old Fixture Removal (30-90 minutes)
Before installing new items, we carefully shut off the water supply, drain existing lines, and professionally remove old toilets, sinks, or showers. We take care to protect your property during this stage.
- 3
New Fixture Installation and Connection (60-240 minutes)
This is the core of the process. We meticulously position the new sanitary ware, make all necessary water supply and drainage connections, and ensure secure fastening. This includes precise sealing to prevent any leaks.
- 4
Testing, Cleanup, and Handover (15-30 minutes)
Once installed, we thoroughly test all new fixtures for leaks, proper flushing, and drainage. We then clean the work area thoroughly and provide you with any necessary maintenance advice. We won't leave until you are completely satisfied.
