Our Efficient Tap Replacement Process
Our tap replacement service in Sant Gervasi - la Bonanova follows a streamlined four-step process designed for efficiency and quality, typically completed within 60 to 120 minutes per tap.
- 1
Initial Assessment and Isolation (15-20 minutes)
Upon arrival, our plumber will first assess the existing tap and surrounding plumbing. We'll then locate and shut off the main water supply to the affected area, or the entire property if necessary, to prevent any water leaks during the replacement. This crucial first step ensures a safe working environment.
- 2
Removal of Old Tap (20-40 minutes)
With the water supply isolated, we carefully disconnect the water lines and unmount the old tap from its fixture. This often involves working in tight spaces under sinks or behind basins, requiring specialised tools and careful handling to avoid damaging the existing sink or countertop.
- 3
Installation of New Tap (30-60 minutes)
The new tap is then positioned and securely fastened. We connect the hot and cold water supply lines, ensuring all connections are tight and leak-free. Attention to detail here is paramount to prevent future issues. We also install any associated components, such as aerators or pull-out sprayers.
- 4
Testing and Cleanup (11-20 minutes)
Once the new tap is installed, the water supply is gradually restored. We thoroughly test the new tap for proper function, water flow, and, most importantly, any signs of leaks. We check both hot and cold lines and the drain. Finally, we clean up the work area, disposing of the old tap and any debris, leaving your space tidy and fully functional.
