How we work
Call us, text us on WhatsApp, or request your quote online – we'll reply in under 10 minutes during business hours. To add a new socket where there wasn't one before, there are two approaches. The first is chasing. We cut a channel in the wall from the nearest socket to the new point, run the cable inside, and then repair the channel with plaster. This is the most visually clean option but involves minor building work and repainting the wall. Duration: 4-6 hours plus wall repair. Changing a standard switch to a dimmer switch requires first checking that the light fitting is compatible. Standard LED bulbs are often not dimmable. Only LEDs labelled 'dimmable' work well with a dimmer. Older halogen bulbs dim without issue but are rarely used now due to their high energy consumption.
