How we work
Call us, message us on WhatsApp, or request your quote online — we'll reply in less than 10 minutes during business hours. There are two approaches to adding a new socket where there was none before. The first is chasing. Cutting a channel in the wall from the nearest socket to the new point, running the cable through it, and closing the channel with plaster. This is the cleanest visually but involves minor construction work and repainting the wall. Timeline: 4-6 hours plus wall repair. Changing a standard switch to a dimmer switch requires first checking that the luminaire is compatible. Standard LED bulbs are often not dimmable. Only LED bulbs labelled 'dimmable' work well with a dimmer. Old halogens dim without issue but are rarely used now due to consumption.
