- How long does a complete new installation take?
- For a new build property of 80-120 m², 8-15 working days including wiring, fittings, and electrical certificate. For renovations on existing installations, 5-10 days.
- How do I calculate the power I need?
- We calculate based on a site visit, considering planned appliances, kitchen, air conditioning, heating, and actual simultaneous usage. For an average home: 5.75-9.2 kW.
- Do you install electric car chargers?
- Yes, we install a dedicated 7.4 kW wallbox with its own circuit. For communal garages, we coordinate with the community and handle the paperwork.
- Do you handle the paperwork with the distributor?
- Yes, we directly manage the electrical certificate and power change with Iberdrola or Endesa depending on the area. The client only signs the authorisation.
- What warranty does a new installation have?
- Official manufacturer warranty on materials (3-10 years depending on the brand) and our 30-day warranty on labour. The certificate legalises the installation.
- ## Ready to solve your problem?
- Call us, message us on WhatsApp, or request your quote online — we respond in under 10 minutes during business hours.