How we work
The construction process is quite clean. We first erect the galvanised steel profile metal frame, screwed to the floor and ceiling. Electrical cables and water pipes, if any, are run through, and the interior is filled with rock wool or glass wool for considerable acoustic insulation. Plasterboard panels are screwed to both sides. Joints are taped with fibreglass tape and jointing compound, sanded between coats to achieve a completely smooth surface ready for painting. Call us, message us on WhatsApp, or request your quote online — we'll reply in under 10 minutes during business hours. The project begins with a technical visit where we measure the current space and identify what can be modified and what is structurally untouchable. Then we discuss with you what you want to achieve. Just modernisation maintaining the current layout, or a complete layout overhaul (typical in bathrooms where a bath is removed for a large shower). We create an initial sketch, show it to you, and adjust it based on your feedback. Only then do we prepare a detailed quote itemised by specific chosen materials.
