How we work
Call us, message us on WhatsApp, or request your quote online – we reply in under 10 minutes during business hours. We start with ceilings, light fittings, air ducts, and the tops of wardrobes, where the finest dust accumulates. We then move to walls, doors, frames, skirting boards, radiators, and curtain tracks. Next is interior and exterior woodwork, windows (inside and out), taps, and sanitaryware. We finish with the floors, which are done last as they receive everything that falls during the process. Thorough vacuuming, mopping with a neutral cleaner, and, if necessary, a second mop to remove the last traces of construction dust. The treatment requires addressing the source of the water, not the internal symptom. If the roof is degraded, the entire waterproofing needs renewal with new asphalt membrane or a projected liquid polyurethane system. If the facade has structural cracks, they are sealed with elastic sealant and repainted with specific facade paint that covers micro-cracks. Only after ensuring the exterior is watertight do we repair the interior wall.
