Our Meticulous Wall Smoothing Process
Our wall smoothing service is a systematic process designed to deliver impeccable results, typically completed within 1 to 3 days for an average room, depending on the initial wall condition.
- 1
Initial Assessment & Preparation (2-4 hours)
We begin by thoroughly inspecting the walls, identifying areas with gotelé, cracks, or other damage. Furniture is moved and protected, and floors are covered with heavy-duty sheeting. Loose paint or plaster is scraped away to ensure a stable base.
- 2
Rough Smoothing & Repair (4-12 hours)
A first layer of specialised smoothing compound is applied to fill major imperfections and begin levelling the surface. Deeper cracks are repaired with appropriate fillers. This stage is critical for establishing a consistent foundation.
- 3
Fine Smoothing & Sanding (4-10 hours)
Once the initial layer is dry, subsequent thinner layers of a finer smoothing compound are applied. Each layer is meticulously sanded using professional dust-extraction sanders to achieve a perfectly flat and smooth surface. This step is repeated until the desired finish is attained.
- 4
Final Inspection & Priming (2-4 hours)
After final sanding and thorough dust removal, the walls undergo a rigorous inspection to ensure absolute smoothness. A high-quality primer is then applied, which seals the surface, improves paint adhesion, and guarantees an even colour absorption for the subsequent paint layers.