Our wall smoothing process in Pedralbes
We begin with a detailed inspection of the walls to assess their condition and existing finish, estimating around 2 hours for a medium-sized property. Next, we prepare the work area by covering furniture and floors with protective sheeting and masking tape, a step that typically takes 1 to 2 hours. We apply a layer of primer or a special filler paste to cover cracks and level the surface, depending on the needs, which may require 3 to 6 hours to dry. Once dry, we proceed with fine, meticulous sanding using specialised equipment to achieve a perfectly smooth and uniform texture, a task that can take between 4 and 8 hours. Finally, we thoroughly clean all generated dust and apply a final coat of sealer or primer, leaving the walls ready for painting, completing the job in about 2 hours. The total time varies based on complexity and surface area.