Our Wall Skimming Process: A Step-by-Step Guide
Our comprehensive wall skimming process is designed for efficiency and minimal disruption, typically completed within 1 to 3 days depending on the scope.
- 1
Initial Assessment and Preparation (2-4 hours)
We begin with a thorough inspection of your walls to identify all imperfections and determine the best approach. This includes protecting your floors and furniture with drop cloths and masking tape, and preparing the surfaces by cleaning, sanding, and filling any large holes or cracks.
- 2
First Coat Application (4-8 hours)
The first layer of skim coat is applied evenly across the entire wall surface. This coat is crucial for levelling and establishing the smooth base. We ensure even coverage and pay close attention to corners and edges.
- 3
Drying and Sanding (12-24 hours)
After the first coat has dried completely, which typically takes overnight, we meticulously sand the surface. This step removes any minor bumps or ridges, ensuring a perfectly smooth and uniform finish before the next application.
- 4
Second Coat and Final Finish (4-8 hours)
A thinner, final coat of skim plaster is then applied. This layer refines the surface to an impeccable smoothness. Once dry, a final light sanding is performed, leaving your walls perfectly prepared for painting or wallpapering. Total project duration varies by wall area and existing condition.