Our Appliance Connection Service: A Step-by-Step Guide
Our plumbing service for connecting washing machines and dishwashers follows a clear, efficient process to minimise disruption and ensure quality.
- 1
Initial Assessment and Preparation (15-30 minutes)
Upon arrival at your Diagonal Mar property, our plumber will assess the existing water supply, drainage points, and electrical connections. We'll identify any necessary adaptations, such as installing new stopcocks or modifying pipework. We'll also ensure the area is clear and protected before commencing work.
- 2
Water Supply and Drainage Connection (30-60 minutes)
This crucial step involves securely attaching the appliance's water inlet hose to the cold water supply valve, often located under the sink or behind the appliance. Simultaneously, the drainage hose is connected to the wastewater outlet, ensuring a tight seal to prevent leaks and proper water flow away from the appliance.
- 3
Appliance Levelling and Testing (15-20 minutes)
Once connected, the appliance is carefully positioned and levelled to prevent vibrations and ensure optimal performance. We then run a test cycle on both the washing machine and dishwasher to meticulously check for any leaks at connection points, verify correct water intake, and confirm efficient drainage.
- 4
Final Checks and Client Briefing (10-15 minutes)
After successful testing, we conduct a final visual inspection, clean up the work area, and provide you with essential operational tips and maintenance advice for your new appliance. We'll address any questions you may have, ensuring you are completely satisfied with the installation.
