- ## What does a complete bathroom renovation include?
- - Demolition and removal of sanitary ware/cladding
- ## How long does a bathroom renovation take?
- In practice, a bathroom renovation usually takes between **1 and 2 weeks**, depending on the work and if any installations need to be altered.
- ## How much does a bathroom renovation cost in 2026?
- The price depends on the size, quality of materials, and if existing installations need updating. As a guide, industry resources estimate the average cost per sq.m to be in the indicative range of 650–750 €/m². The correct approach is to give you a **fixed price itemised by task** after a site visit, so you know exactly what is included and what isn't.
- ### How long does a complete bathroom renovation take?
- #### In most cases, a bathroom renovation takes around 1 week for an average-sized bathroom with a well-defined scope. It can take longer if there are changes to installations, a wait for materials, or unforeseen issues arise. Very important: actual times depend on whether plumbing/electrics are affected and the availability of materials.
- ### How long does it take to change a bathtub to a shower tray?
- #### In many cases, it can be completed within 24 hours. It's common for the new shower tray/worked areas to need drying/curing time, and it's not recommended to use the shower for at least 2 days after completion. Very important: “fast” does not mean “usable immediately”; we prioritise proper sealing to prevent leaks.
- ### What does a complete bathroom renovation include (turnkey)?
- #### Depending on the scope, it includes: Demolition and removal, adjustments/renewal of plumbing and drains, electricity and lighting, tiling and flooring, installation of sanitary ware and taps, shower tray/bathtub and screen, finishing touches (grouting and sealing) and final cleaning. Very important: a serious quote will be itemised by task so you know exactly what is included.