Our Appliance Connection Process in Montcada i Reixac
Our installation process is designed for efficiency and minimal disruption, typically completed within 1 to 3 hours depending on complexity.
- 1
Initial Assessment and Preparation (15-30 minutes)
Upon arrival, our technician will assess the installation site, verify existing connections, and identify any necessary modifications. We'll protect your flooring and surrounding areas before beginning work.
- 2
Water Supply and Drainage Connection (30-60 minutes)
We carefully connect the appliance to the cold water supply using appropriate hoses and check for secure seals. The drainage hose is then routed and connected to the waste pipe, ensuring proper gradient for efficient water evacuation.
- 3
Electrical and Levelling (15-30 minutes)
The appliance is safely plugged into a suitable electrical outlet. We then meticulously level the machine using a spirit level, adjusting its feet to prevent vibrations and ensure quiet operation.
- 4
Testing and Handover (15-30 minutes)
A full test cycle is run to check for any leaks at connection points and to confirm correct functionality. We'll provide a brief overview of the installation, answer any questions, and ensure the work area is left clean and tidy.
