Our Sanitary Installation Process in Terrassa
Our installation process is designed for efficiency and minimal disruption, typically completed within a few hours for a single fixture or a full day for a complete bathroom. First, we conduct an initial site assessment (20-30 minutes) to understand your specific needs, inspect existing plumbing, and confirm fixture specifications. Next, we prepare the area (30-60 minutes), shutting off water, removing old units, and preparing connection points. The core installation phase (1-3 hours per fixture) involves carefully positioning and securing the new sanitaryware, connecting water supply lines, and ensuring proper drainage and sealing. Finally, we perform thorough testing and quality checks (15-30 minutes), running water through all new fixtures to verify leak-free operation and optimal performance, leaving your space clean and ready for use.