Our Sanitary Installation Process in Mollet del Vallès
Our installation process is designed for clarity, efficiency, and minimal disruption, typically completed within a few hours to a full day depending on complexity. Here’s how we ensure a smooth installation:
- 1
Initial Assessment and Quote (30-60 minutes)
We begin with a site visit to understand your specific requirements, assess existing plumbing, and take necessary measurements. This allows us to provide a detailed, transparent quote outlining all costs for labour and materials.
- 2
Preparation and Old Fixture Removal (1-2 hours)
Once approved, we prepare the work area, protecting surrounding surfaces. If replacing existing units, we carefully disconnect and remove the old sanitary ware, ensuring proper disposal according to local regulations.
- 3
New Sanitary Ware Installation (2-4 hours per unit)
Our plumbers meticulously install the new toilet, bidet, sink, or shower tray. This involves securing the unit, connecting water supply lines, ensuring watertight seals, and connecting to the waste drainage system. We use appropriate tools and techniques for a secure and level fit.
- 4
Testing, Sealing, and Cleanup (30-60 minutes)
After installation, we thoroughly test all new connections for leaks, check water pressure, and ensure correct functionality. We then apply silicone sealant where necessary for a clean finish and optimal waterproofing. Finally, we clean the work area, leaving your space tidy and ready for use.
