How we work
Call us, message us on WhatsApp, or request a quote online — we'll reply in under 10 minutes during business hours. To add a new socket where there wasn't one, there are two approaches. The first is chasing. This involves cutting a channel in the wall from the nearest socket to the new point, pulling the cable through, and then repairing the channel with plaster. It's the neatest visually but involves minor construction work and repainting the wall. Duration: 4-6 hours plus wall repair. Changing a standard switch to a dimmer switch requires first checking if the light fitting is compatible. Standard LED bulbs are often not dimmable. Only LEDs specifically labelled 'dimmable' work well with a dimmer. Older halogen bulbs dim without issue but are rarely used now due to energy consumption.
