How we work
Call us, send us a WhatsApp message, or request your quote online — we'll reply in less than 10 minutes during business hours. To add a new socket where there wasn't one, there are two approaches. The first is to cut a channel. Open a channel in the wall from the nearest socket to the new point, thread the cable through, and close the channel with plaster. This is visually tidiest but involves minor building work and repainting the wall. Timeframe: 4-6 hours plus wall repair. Changing a standard switch to a dimmer switch requires first checking that the light fitting is compatible. Standard LED bulbs are often not dimmable. Only LED bulbs labelled as dimmable work well with a dimmer. Old halogen lights dim without issue but are hardly used anymore due to energy consumption.
