- How long does a complete new installation take?
- For a new build property of 80-120 m², it takes 8-15 working days, including wiring, fixtures, and the official certificate. For renovations on an existing installation, 5-10 days.
- How do I calculate the power I need?
- We calculate based on a site visit, considering planned appliances, kitchen, air conditioning, heating, and actual simultaneous usage. For an average home: 5.75-9.2 kW.
- Do you cover electric car charger installations?
- Yes, we install a dedicated 7.4 kW wallbox with its own circuit. For communal garages, we coordinate with the community and manage the necessary procedures.
- Do you manage the paperwork with the distribution company?
- Yes, we directly handle the official certificate and power change requests with Iberdrola or Endesa, depending on the area. The client only needs to sign the authorisation.
- What warranty does a new installation have?
- Official manufacturer warranty on materials (3-10 years depending on the brand) and our 30-day warranty on labour. The official certificate legalises the installation.
- ## Ready to solve your problem?
- Call us, message us on WhatsApp, or request your quote online — we'll reply in under 10 minutes during business hours.