Salt efflorescence on low wall in Sant Adrià de Besòs
Resumen rápido
Rising damp.
¿Qué está pasando?
No DPC.
Causas más probables
No damp-proof course
altaPre-1960.
Hidden leak
mediaLocalised.
Poor ventilation
mediaVentilate.
Pasos de diagnóstico
- 1
Vacuum salts
HEPA.
⚠ Parada de seguridad: FFP2 and gloves. - 2
Air daily
Lower RH.
- 3
Don't paint over
Cause first.
Cuándo llamar a un profesional
Call for treatment.
Coste orientativo en Sant Adrià de Besòs
250–700 €
Inject and repaint.
Contexto local · Sant Adrià de Besòs
Historic ground floors.
Sant Adrià de Besòs is small but very fragmented: La Mina, El Besòs and La Catalana are three different building realities. In La Mina we work in PERI-refurbished blocks whose kitchens and bathrooms are still 1970s originals — the tiling lets go on the first sounding. La Catalana keeps low fishermen's houses refurbished inside while preserving the façade, so we coordinate any visible change with the council. Sea and river air force siloxane façade paint and stainless hardware. Kerb-side parking is usually possible, which cuts the cost of bulky-material jobs versus central Barcelona.
- Comarca: Barcelonès
- Población: 38.260 hab.
- Parque de vivienda predominante: mixto
- Año medio de construcción: 1980
- Códigos postales: 08930
Frente marítimo del Besòs con la Mina, polígonos industriales reconvertidos y nuevas promociones en La Catalana.
Preguntas frecuentes
Returns?
Cause first.
Injection works?
70–90%.
Drying time?
6–12 mo.
¿Prefieres que vayamos nosotros?
Diagnóstico y presupuesto en Sant Adrià de Besòs normalmente el mismo día.
Pedir presupuesto gratisProblemas relacionados en Sant Adrià de Besòs
Más sobre Damp, mould and paint
Sources and regulation
- CTE DB-HS 1 — Protección frente a la humedad — Código Técnico de la Edificación